Resource Library / Journal Article / Techno-economic feasibility assessment of distributed and decentralised biomass supply chain network for green hydrogen production – A case study from India
Techno-economic feasibility assessment of distributed and decentralised biomass supply chain network for green hydrogen production – A case study from India
Journal Article
1 October 2026
Abstract
The increasing GHG emissions from energy systems over the past decades have prompted the transition towards renewable energy. Agro-residues, such as rice straw, maize cobs, and sugarcane trash, can be converted into hydrogen, biofuels and electricity, providing a sustainable alternative to fossil fuels. However, the consistent availability of feedstock for bioenergy systems is impacted by the ineffective harvest and collection of residues, transportation, storage, and processing. A robust biomass supply chain network (BSCN) is hence required to enable reliable feedstock supply from the farms to the biorefineries, considering the biomass yields, time constraints for residue handling, and the local availability of resources (machinery, labour, and vehicles). The bulky nature of the agro-residues and their distributed availability necessitate decentralised procurement and densification to reduce transportation costs. This work, using an Indian case study, explores a decentralised BSCN to enable a reliable feedstock supply from agro-residues for green hydrogen production. Decentralised residue procurement and centralised biorefineries in each district ensure low transportation costs and high residue utilisation rates. The model incorporates the time constraints for biomass collection and evaluates four scenarios of machinery and labour engagement. Increasing machinery adoption in residue collection improves the time efficiency of collection, leading to low delivered biomass costs (DBC) and high green hydrogen potentials. An average DBC of INR 7421/tonne (USD ($) 87.33) and an aggregate potential of 0.53 million tonnes of green hydrogen is feasible in Karnataka, India, for scenarios of high mechanisation. The proposed approach is replicable globally for a variety of biomass mixes.
Summary
• Decentralised procurement of agro-residues reduces delivered biomass costs.
• Time constraints for residue collection affect feedstock availability. • High machinery use for residue collection increases the residue utilisation rate.
• Estimated delivered biomass costs of about INR 7421/tonne (USD 87.33).
• Green hydrogen potential of up to 0.53 MT is feasible in Karnataka, India.
Presented At/Published In
Biomass and Bioenergy
Country
Citation
Gautham Srinivas Ganesh, Balachandra Patil, S. Dasappa, Techno-economic feasibility assessment of distributed and decentralised biomass supply chain network for green hydrogen production – A case study from India, Biomass and Bioenergy, Volume 201, 2025, 108094, ISSN 0961-9534, https://doi.org/10.1016/j.biombioe.2025.108094.